![]() |
![]() |
![]() ![]() ![]() |
![]() ![]() |
More ... see the USDA/NRCS Pervious Parking project in Fairfield Iowa >> www.ecoterr.com/iowa_nrcs
![]() ![]() ![]() |
![]() Pervious Grass Parking:
![]() (see also St. Louis County, MO
Tilles Park Pervious Grass Parking >> www.ecoterr.com/tilles_park
Please note below that these parking stalls ARE the bio-remediation.
> Stormwater Runoff is diverted ONTO the parking spaces, which serve as infiltration assets.
> When correctly engineered and fully utilized, StabiliGrid may replace - or make unnecessary - many or all additional stormwater runoff or nonpoint source pollution control design feature and structures, such as:
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
ASFINAG Straßenabschnitt A1 Salzburg
![]() ![]() ![]() |
![]() ![]() |
(note: exposed grids shown before backfilling/seeding)
![]() ![]() ![]() |
You may not see these types of applications with any HDPE stabilizer grids - for very long ...
|
![]() ![]() ![]() ![]() |
|
Referenzen Steiermark Graz Liebenau, Geleise Straßenbahn bei Stadion Liebenau Graz ca. 2800 m² (grass pictured after only 2 1/2 weeks of growth)
Which do you think grows healthier grass,
StabiliGrid or concrete pavers?
![]() ![]() ![]() |